PRESS CENTER

PRESS CENTER: (044) 585-53-73 /pr@tmm.ua

As at 10th April 2017, the following construction works are underway at Alter Ego premium class residential complex (7 Laboratornyi Lane, Kyiv): vertical monolithic frame construction works are at the final stage; brick laying works are underway at the level of 14th and 16th floor (block A and B respectively); double glazed windows installation works are underway. Ventilation and fire alarm systems as well as elevator equipment installation works are being carried out.

Alter Ego premium-class residential complex comprises two 24-storey residential blocks. The total area of the complex is 43.6 thousand sq m. The areas of apartments vary from 52 to 170 sq m. The internal infrastructure of the complex will include a fitness center, restaurant, shops, and other amenities.

Alter Ego website: http://pechersk.tmm.ua/en