As at 30th November 2016, the following construction works are to be carried out before completion of the fourth phase of TMM’s Sonyachna Brama residential complex (73-79 Lomonosova Str., Kyiv):

In building B-6, the following works are to be carried out:
- Elevators equipment installation
- Heating meters installation
- Cold and hot water meters installation
- Electric power meters installation
- Ventilation system installation in the basement

In building B-7, the following works are to be carried out:
- Cold and hot water meters installation
- Electric power meters installation
- Balcony protective sheets installation