As at 05 July 2018, the following construction works are carried out at Alter Ego premium class residential complex:

Residential block А:
  • Cabling works – 12-23 floors
  • Floor finishing works in public areas – 90%
  • Switchboard rooms equipment installation
  • Radiators installation – 6-9 floors
  • Translucent constructions installation – 1-3 floors
  • Ventilated façade works – 95%
  • Cabling works in apartments – 8-18 floors
Residential block B:
  • Floor finishing works in public areas – 90%
  • Translucent constructions installation – 1-3 floors
  • Cement floor finishing works – 90%
  • Switchboard rooms equipment installation
  • Cabling works – 4-23 floor
  • Ventilated façade works – 95%
  • Cabling works in apartments – 4-14 floors
Block C:
  • Roofing – 50%
Parking:
  • Cabling works in the parking – 80%

Alter Ego residential complex comprises two 24-storey residential blocks. Areas of the 360 apartments with modern layout solutions vary from 52 sq. m to 268 sq. m.

The internal infrastructure of the complex will include a parking lot, fitness center, restaurant, shops, and other amenities for comfortable living of the residents.

We are glad to answer all your questions and assist with selection of an apartment or an office!

+38 (044) 290 30 82

market@tmm.ua

7 Laboratornyi Lane, Kyiv

http://pechersk.tmm.ua/en

https://www.facebook.com/alter.ego.tmm/

https://www.youtube.com/channel/UCLB3mSwSIFteqVWYsmm9HhQ